MACHINERY REGULATION

(EU) 2023/1230

Is your documentation really ready for January 20, 2027?

Ready for the new Machinery Regulation?

From 2027 you can deliver machinery documentation digitally. QRcube® supports the management and retention of this documentation, with version traceability and the paper version always available when needed.

Contact us

SDS – Safety Data Sheets

Delivering the sheet to the customer isn't enough: every revision under Article 31(9) must be sent without delay to recipients supplied in the previous 12 months. Missing an update: administrative fines up to €60,000.

Distribute SDS with no risk

With SDS Manager you send sheets to your customers, propagate updates to those who received them and keep proof of every transmission. Fully tracked, supporting compliance.

Contact us
All industries →
PlansCertiblogSecurityAboutPartnerContact
Start free
Logo DWD - Drinking Water Directive (UE) 2020/2184
QRCube · DWD — Drinking Water Directive

Your product's declaration of conformity, always at your fingertips with a QR

For manufacturers of valves, taps, and fittings who need to demonstrate compliance with new EU requirements for materials in contact with drinking water — without changing their production process.

Directive (EU) 2020/2184 Applicable from December 31, 2026 No changes to the production cycle
Valves and brass fittings with QR label on production bench, technician consulting conformity certificate on tablet

The regulatory framework

What changes for those who produce or import components intended for contact with drinking water.

Directive (EU) 2020/2184, Art. 11

Article 11 of Directive (EU) 2020/2184 and Delegated Regulation (EU) 2024/370 set hygiene requirements and conformity assessment procedures; the EU declaration is drawn up by the manufacturer or their authorised representative (Italian Legislative Decree 18/2023, Article 10(7)).

Delegated Regulations (EU) 2024/370 and 2024/371

The first defines conformity assessment procedures and the second marking specifications. The new rules apply from 31 December 2026, subject to transitional periods until 31 December 2032.

Repeal of DM 174/2004

The new EU rules on conformity assessment, the EU declaration and marking apply from 31 December 2026. For products with a national certificate still valid on that date, Delegated Regulation (EU) 2024/370 applies from 31 December 2032; Italian Legislative Decree 18/2023 provides for other transitional periods until the same date.

Retention of technical documentation

The DWD does not set a retention period for technical documentation. Ten years is a prudent reference commonly used in EU product legislation, not a DWD requirement.

The problem, today and after the sale

Production isn't the hard part: it's proving, even years later, that a component meets the requirements.

Traceability of materials in Positive Lists

Manufacturers, importers, and supply chain operators must confirm the controlled traceability required by the DWD — release tests and use of base materials contained in the Positive Lists — and often wait for the technical office to find the right document, perhaps via email.

Batch disputes difficult to reconstruct

Quickly identifying which manufactured and then installed components belong to a certain batch is almost impossible with paper archives or scattered folders.

Proof of conformity required immediately

In tenders or during the specification phase, and in customs and public health inspections, proof must be provided immediately: a delay can cost the contract or block the material.

The after-sales problem

A valve installed today remains underground or hidden for decades, well beyond the lifespan of an email archive. Meanwhile, the company may change location, management software, and even the technical manager who knew where to find that certificate.

Certiblok connects the product to its documents

A physical and permanent access point, updatable over time.

QRCube® on the component

A physical QR applied to the component, packaging, or batch links to a constantly updated digital archive: conformity certificate to the Positive List, alloy composition, technical data sheet, test report.

Update the document, not the QR

When the certificate changes — new regulation, renewal, correction — the linked document is updated: the already printed QR remains the same, with no reprints or label recalls.

Batch traceability without PLM/ERP

Designed for companies without batch tracking systems: replaces folders and emails with a single verifiable access point, from component to batch to certificate.

Controlled and tracked access

Anyone who scans — customer, installer, inspector, foreign entity — immediately sees the correct document; confidential content remains visible only to authorised users.

Sei un installatore? Vai alla pagina Impianti idraulici →

Why it matters for valve and fitting manufacturers

The practical effects on daily compliance management.

31
Start of new EU rules
Delegated Regulations (EU) 2024/370 and 2024/371
31/12/2026
New EU conformity rules
Transition until 31 December 2032
10 anni
Prudent reference for documentation
Not a retention period set by the DWD
0
QR reprints when certificate changes
The linked document is updated, not the label

How QRCube works

Four steps, no changes to the production cycle.

01

Apply the QR to the product

A physical QR goes on the component, packaging, or batch. No changes to the manufacturing process.

02

Link the documents

Conformity certificate to the Positive List, alloy composition, technical data sheet, construction drawings, and test reports are placed in a digital archive linked to the QR.

03

Update when needed

New regulation, renewal, or correction: the linked document is replaced and the printed QR remains valid.

04

Anyone who scans sees the right document

Customer, installer, inspector, or foreign entity independently access the correct and verifiable document, even years later.

Key features for the sector

The Certiblok modules most used by manufacturers of valves, taps, and fittings.

Italian Market

Immediate response to resellers and installers: less time spent by the technical office retrieving documents upon request.

Foreign Market

Ready-to-use proof of conformity for tenders and specifications in DACH and Northern Europe, where documentary requirements are more stringent and frequent.

Batch Management

In case of recall or dispute, it's possible to trace from the component to the batch and the certificate in seconds.

DRM® & Archive

Centralized archive with versioning, history, and access logs: you always know which document was valid on a certain date and who consulted it.

A concrete example

A typical scenario for a faucet and valve manufacturer. The company is an example; the linked QRCube is real and navigable.

Use case — faucet and valve manufacturer

Altoflusso Taps SpA

The challenge. Technical and compliance documentation scattered across network folders and emails, with continuous requests from resellers, installers, and foreign customers.

The solution. A QRCube activated on a product links the technical data sheet, construction drawings, and compliance documentation: a single point of access, updatable over time without changing the printed QR.

Apri il QRcube® di esempio ↗

Altoflusso Taps SpA

Frequently asked questions

What changes from 2027 for manufacturers of valves, taps and fittings?
The new EU rules on conformity assessment, the EU declaration and marking apply from 31 December 2026. For products with a national certificate still valid on that date, Delegated Regulation (EU) 2024/370 applies from 31 December 2032; Italian Legislative Decree 18/2023 provides for other transitional periods until the same date.
Who is responsible for product conformity under the DWD?
Article 11 of Directive (EU) 2020/2184 and Delegated Regulation (EU) 2024/370 set hygiene requirements and conformity assessment procedures; the EU declaration is drawn up by the manufacturer or their authorised representative (Italian Legislative Decree 18/2023, Article 10(7)).
Do I have to reprint the QR codes when a certificate is updated?
No. With QRcube® the physical QR applied to the component, the packaging or the batch points to a digital archive: when a certificate changes because of new legislation, a renewal or a correction, you update the linked document and the QR codes already printed remain valid.
How long must the technical documentation be kept?
The DWD does not set a retention period for technical documentation. Ten years is a prudent reference commonly used in EU product legislation, not a DWD requirement.
Do I need a PLM or an ERP to trace batches?
No. QRcube® is designed also for companies without batch tracking systems: it replaces network folders and email with a single verifiable access point, so in case of a recall or a dispute you go from the component to the batch and the certificate in seconds.

Let's talk about it

If you produce valves, taps, or fittings and want to understand how QRCube simplifies DWD compliance and batch traceability, we'll show you a demo tailored to your use case. Alternatively, discuss it with your trusted consultant or your local Certiblok distributor.